
Klargester Plant and Pipework in Outwell
A new Klargester treatment plant and a headwall in the dyke with new pipework ready for a new build in Outwell.

A new Klargester treatment plant and a headwall in the dyke with new pipework ready for a new build in Outwell.

A manual cover and frame replaced in brick weave at Pilgrim Foods in King’s Lynn.

Excavated to remove a damaged pipe caused by a mass of roots in King’s Lynn.

New temporary toilet and sink waste pipes on a static caravan in Outwell.

A new manhole cover and frame replaced at Dersingham School June 2023.

Rainwater pipes and an AquaCell soakaway were installed to take away the rainwater at this property in Methwold.