Overflow storm water pipe diverted & new gully connection Pilgrim’s Kings Lynn
Overflow storm water pipe diverted and new gully connection at Pilgrim’s Kings Lynn November 2023.
Overflow storm water pipe diverted and new gully connection at Pilgrim’s Kings Lynn November 2023.
Removed carport, new land drain installed. Replaced new rainwater pipes and new gully surround, in South Wootton. September 2023.
Installed a new drainage field and new manhole cover and frame in West Walton September 2023.
Replaced the cover and laid new tarmac at a factory in Fakenham. Cut out the concrete and tarmac around a damaged cover.
New manhole cover and frame installed at Barroway Drove October 2023.
A new Klargester treatment plant and a headwall in the dyke with new pipework ready for a new build in Outwell.
A manual cover and frame replaced in brick weave at Pilgrim Foods in King’s Lynn.
Excavated to remove a damaged pipe caused by a mass of roots in King’s Lynn.
New temporary toilet and sink waste pipes on a static caravan in Outwell.